Mark and Teresa Richey, along with consultants, recently
visited the Elecon plant in India to inspect our wind turbine
during the manufacturing process.

Tour of the Elecon factory.

Elecon Chairman, Mr. Patel presents Mark and Teresa with the
"key" to the turbine. This is Elecon's first installation in the U.S.

Mark Richey and Don Bowen of Meridian Associates
"200 feet off the deck" standing on top of a recently
installed Elecon/Turbowinds 600T in Gujarat, India.

Mark and Teresa in front of three 77 foot long blades
ready for shipment at the LM blade fatory in Bangalore, India.

Final adjustments and testing of the hydraulic pitch control
mechanism for the blades.

Mark stands proudly on top of a 600T turbine in Gujurat, India.
We are excited about the installation of our wind turbine and
the cost savings it will mean for us and our customers.